Scaling Up? Why Bigger Grow Operations Need Bigger Interceptor Plans

commercial grow operation irrigation

A grow house that’s gone from a few flowering rooms to a full commercial operation puts a lot more wastewater through the same pipes. The interceptor that handled your original setup without a problem may not keep up now, and that’s a bigger issue than a slow drain. When a grow house outgrows its interceptor,…

Read More

The Real Reason Lift Stations Fail in Summer Heat

sewage pump station access system

Summer heat can expose weaknesses in a lift station that were already developing before temperatures climbed. The heat itself is not usually the single cause of a failure. Instead, higher temperatures can intensify conditions inside the wet well, increase odor and corrosion risks, put electrical and control equipment under greater environmental stress, and make existing…

Read More

Special Event Holding Tanks: What Wedding and Festival Planners Overlook

stacked transparent event chairs

A wedding, festival, concert, or outdoor gathering can have a carefully planned layout, catering schedule, entertainment lineup, and guest count, yet wastewater service can get pushed to the bottom of the list. That can create problems when the event site does not have enough sewer capacity or a practical connection to a sewer system. A…

Read More